{"id":848,"date":"2024-10-10T11:55:43","date_gmt":"2024-10-10T10:55:43","guid":{"rendered":"https:\/\/www.advancedrms.co.uk\/web\/?p=848"},"modified":"2024-10-10T11:55:43","modified_gmt":"2024-10-10T10:55:43","slug":"ge-vernova-south-africa","status":"publish","type":"post","link":"https:\/\/www.advancedrms.co.uk\/web\/ge-vernova-south-africa\/","title":{"rendered":"GE Vernova &#8211; South Africa"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-849\" src=\"https:\/\/www.advancedrms.co.uk\/web\/wp-content\/uploads\/2024\/10\/GE-VRNV_Standard_RGB-Evrgrn.png\" alt=\"\" width=\"300\" height=\"101\" \/><\/p>\n<p>ARMS Ltd has previously worked closely with Alstom Power during the construction of the Kusile Power Station near Witbank, South Africa. This was a large project consisting of \u00a06 generating units with an eventual capacity of 800 MW each bringing the total installed capacity of 4,800 MW. This was a major undertaking and ARMS Ltd were instrumental in assisting the project to create and maintain a very strong safety culture.<\/p>\n<p>Now as an operational plant and under the O&amp;M of GE Vernova we are proud to say were asked by the Regional Leader for Steam Power to return to help consolidate and build on the safety culture within the operational team. We developed a bespoke approach around our <strong>&#8216;6 key attitudes to risk&#8217; <\/strong>and rolled this programme out during September and early October 2024. The results speak for themselves:<\/p>\n<p style=\"font-weight: 400\">The average \u2018positive attitude shift&#8217; across all project attendees was a satisfying: <strong>37%<\/strong><\/p>\n<p style=\"font-weight: 400\">Programme feedback rated the \u201cUsefulness of the Workshops\u201d an average:<strong> \u2013 99% (4.95\/5)<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-850 aligncenter\" src=\"https:\/\/www.advancedrms.co.uk\/web\/wp-content\/uploads\/2024\/10\/Unknown.jpeg\" alt=\"\" width=\"300\" height=\"168\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>ARMS Ltd has previously worked closely with Alstom Power during the construction of the Kusile Power Station near Witbank, South Africa. This was a large project consisting of \u00a06 generating units with an eventual capacity of 800 MW each bringing the total installed capacity of 4,800 MW. This was a major undertaking and ARMS Ltd [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[10],"tags":[],"class_list":["post-848","post","type-post","status-publish","format-standard","hentry","category-successes"],"_links":{"self":[{"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/posts\/848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/comments?post=848"}],"version-history":[{"count":1,"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/posts\/848\/revisions"}],"predecessor-version":[{"id":851,"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/posts\/848\/revisions\/851"}],"wp:attachment":[{"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/media?parent=848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/categories?post=848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.advancedrms.co.uk\/web\/wp-json\/wp\/v2\/tags?post=848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}